Skip to main content

We are considering sidewalk connections on the east side of 174th Avenue, between Arborcrest Way and Tualatin Valley Highway (OR 8). The east side is being considered for the sidewalk connection to align with existing sidewalks on Arbrocrest Way. 

The new sidewalk segment between Wakem Lane and Eirwen Street would likely be six feet wide, with a four-foot planter strip. Part of the sidewalk between Alexander Street and Wakem Lane may include on-street parking, where space allows.

If this street is selected to receive a sidewalk more detailed exhibits will be provided at a future open house.

Download pdf

Existing conditions:
East side of 174th Avenue at Cricket Court

Proposed sidewalk:
East side of 174th Avenue at Cricket Court

Existing conditions:
East side of 174th Avenue at Wakem Street

Proposed sidewalk:
East side of 174th Avenue at Wakem Street